One change, from the board room to the cutover
The same people carry a change from the first board brief to the last cutover. Nothing is thrown over a wall, and every step leaves evidence behind.
Seven steps, one accountable team
Each step leaves something behind that the next one needs.
- 01
Board brief
Principal with your executive teamThe case for the change in plain terms: the risk of doing it, the risk of not doing it, and the cost.
Leaves behind A decision paper the board can sign
- 02
SteerCo sign-off
Principal with your SteerCoScope, waves, rollback rules and who owns each one, agreed before any engineering starts.
Leaves behind Named owners and agreed stop rules
- 03
Architecture and definition
Principal and senior leadsThe target design, the dependency map and the technical definition the engineers build from.
Leaves behind A design your own architects can review
- 04
Isolated twin
Engineers, with OSirisThe change and its rollback built and run in a lab or digital twin of the estate, away from live traffic.
Leaves behind Test evidence for the change and the way back
- 05
Reversible wave
Engineers with your operations teamThe first small wave goes live with its rollback rehearsed and ready. Each wave earns the next.
Leaves behind A wave record and a verified rollback
- 06
Live cutover
Principal signs, your owner approvesThe final cutover, run to the plan the SteerCo agreed, with the old path kept until sign-off.
Leaves behind A signed cutover
- 07
Evidence pack
Handed over to youCode, designs, test results and change records, written as the work happened.
Leaves behind Everything in your own repositories
OSiris does the volume, people make the calls
is our own engineering platform. It builds, tests and checks the work, so a small senior team delivers what would otherwise take a much larger one. Every decision that matters stays with a named person.
Labs and digital twins are built for each engagement, around the estate being changed. runs the engineering work inside them.
What every change goes through
Pen tests under signed rules of engagement
Attacks on our own work, inside limits agreed in writing.
Independent verification
A second check of every change, by something other than the thing that made it.
Fix and rollback
A way back for every change, rehearsed before it is needed.
Signed builds
Every artefact scanned and signed, so you can trace what shipped.